The gymnasium floor at Cooperstown is 12,000 square feet of Robbins Bio-Channel Classic. After removal of the existing fixed wood floor system the floor slab was found to be very rough, so the new Bio-Channel floor system was shimmed and anchored to provide a perfectly flat surface with premium performance. The floor was completed in 2021 under a subcontract with Murnane Building Contractors.