SUNY Albany PE Building and Broadview Arena

SUNY Albany PE Building and Broadview Arena

We recently installed 2 large projects at SUNY Albany. The first was the replacement of the main basketball court at Broadview Arena. We installed that original floor in 2004. The renovation project in 2024 included removing the center area of the floor and installing a new Robbins Bio-Channel Star floor at 90 degrees to the existing maple floor, so the main court would run the long way. Integrating the new floor installation into the existing was challenging and sanding and finishing almost 17,000 s.f. of the new and existing flooring (that now ran in 2 directions) also required extra effort.

We also installed a new 2-color Omnisports Lumaflex floor in the SUNY Albany PE Building. This 20,000 s.f. install was completed in 2024, and was awarded the Tarkett Lumaflex installation of the year.