
Vestal CSD – African Road Middle School 2023
The floor at this middle school was damaged in a flood. After removal, the Western NY Floor Company provided a continuous cementitious leveling compound over the existing uneven floor slab. We then installed a Robbins Air-Channel Star resilient anchored maple floor system. The custom golden brown and green stained areas were chosen to give this floor the same scheme as the Vestal High School floor we sanded and refinished in 2020. The Golden Bear logo at center court is done with stain to give more of a “water-mark” appearance.